Category: | A sign, usually on the cycleway network, indicating a route for cycling.: Other (infrastructure-related) |
Tags: | ccn5, junction, sign |
Date time: | 11.42am, Friday 8th April, 2016 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
The route to Dullatur leaves the path alongside the railway line.
Comments reflect the views of the original submitter only.